Description: Universum08_04 1841 Meyer print LONDON AND GREENWICH RAILWAY (#4) Nice view titled Die Eisenbahn von London nach Greenwich, from steel engraving with fine detail and clear impression, nice hand coloring, approx. page size is 27 x 18.5 cm, approx. image size is 15 x 9.5 cm. From Meyer's Universum, published by Bibliographic Institute Hildburghausen Germany. London and Greenwich Railway The London and Greenwich Railway (L&GR) was opened in London between 1836 and 1838. It was the first steam railway in the capital, the first to be built specifically for passengers, and the first entirely elevated railway. Origins The idea for the line came from Colonel George Thomas Landmann, until 1824 a Royal Engineer, and George Walter, and the company was floated at a meeting on 25 November 1831. It would run from close to London Bridge, convenient for journeys to the City. It would be some 3 3⁄4 miles (6.0 km) long, on a viaduct of 878 brick arches, some of them skew (see London Bridge-Greenwich Railway Viaduct), to avoid level crossings over the many streets which were already appearing in the south of London. Landmann planned to rent the arches out as workshops. The intention had been to descend to ground level after the Grand Surrey Canal but this was opposed by Parliament. The first Act of Parliament was obtained in 1833 for a line from Tooley Street (now London Bridge) to London Street, Greenwich. The ultimate intention was to reach Dover and there was much talk of a London to Gravesend from Greenwich. A scheme was presented to Parliament in 1836 but five others were competing and the bill failed on its second reading. Construction The line ran parallel with Tooley Street, crossing Blue Anchor Road, Corbetts Lane and the Grand Surrey Canal. From there it curved towards the first station, at Deptford High Street, and thence to Greenwich. The contractor was Hugh McIntosh. The subsoil was a blackish peat, which gave considerable problems, and Landmann pioneered the use of concrete to reinforce the foundations. Even so, several of the piers near to Corbetts Lane moved four or five inches (100 - 125mm) out of the perpendicular and on 18 January 1836 two arches close to Tooley Street collapsed. Elsewhere, iron ties were used to prevent lateral spread in the brickwork. In 1840 many of the arches were improved by laying 9 inches (230 mm) of concrete above them, with a layer of asphalt. Between Deptford and Greenwich the River Ravensbourne was crossed at Deptford Creek by a balanced bridge to allow masted vessels to pass. Eight men operated it, but possibly because of trouble with the foundations it was unreliable. It was replaced in 1884 and again in 1963. Originally the line had single parallel tracks of Stephenson gauge 4 ft 8 1⁄2 in (1,435 mm), fixed to stone blocks or sleepers. By 1840 there was a mixture of bridge rails, single parallel and double parallel rails (See Rail profile). The original rails caused excessive noise, and damage to structure and rolling stock. Bridge rails were used on the viaduct between Deptford and Greenwich initially, laid on longitudinal timbers with cross sleepers at four-foot intervals. At this time, new double parallel rails of 78 lb. to the yard were laid for a quarter of mile (400m) at Deptford on timber sleepers, presumably as an experiment. The concrete underlay was replaced with gravel ballast of 2 feet (610 mm) thickness.
Price: 29 USD
Location: Zagreb, Croatia
End Time: 2024-12-13T21:23:16.000Z
Shipping Cost: 8.5 USD
Product Images
Item Specifics
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Original/Reproduction: Original Print
Listed By: Dealer or Reseller
Print Type: Engraving
Subject: Architecture & Cityscape
Style: Realism
Size Type/Largest Dimension: Small (Up to 14")
Date of Creation: 1800-1899
Type: Print
Year of Production: 1841